Why full renovations stay more controlled with us
The whole room is planned
Layout, finishes and service changes are considered before the strip out starts.
Trades work in order
Supporting jobs are lined up around fitting instead of booked in at random.
You keep route options
Supply and fit or fit only installation can still suit different renovation plans.
A full renovation needs more than new units
A complete kitchen renovation changes how the whole room works, not just how it looks. At One Kitchens and Bedrooms, we handle the planning side in house, then link that to a full supply and fit route through One Kitchens and Bedrooms, with the installation and joinery side managed through our core fitting work. From Loftus, we look at layout, services, storage, access and finish before anything is booked in. That makes it easier to plan a room that is ready for real use, while also giving the other moving parts of the renovation a clear sequence instead of leaving them to chance once the old kitchen comes out.


Renovation works better when the whole room is considered
A renovation can include plastering, tiling, joinery adjustments and the service changes needed to support a new layout, not just swapping cabinets. With One Kitchens and Bedrooms, trusted plumbers, electricians and plasterers can be coordinated around the fitting work so the project runs as one managed job. Showroom visits through our suppliers help you settle styles and finishes before ordering, which cuts the risk of late changes once work has started. Many kitchen installation phases take around two weeks once we are on site, although overall timing depends on scope, associated trade work and the chosen specification.
Frequently asked questions
What is included in a complete kitchen renovation?
It usually starts with in house planning and design, then moves into supply and fitting, with wider work such as plastering, tiling and service coordination built around the room as needed. The exact scope depends on your layout, the condition of the existing kitchen and how much change you want to make.
Who schedules plumbing, electrics and plastering?
We manage complete kitchen projects by coordinating trusted trades around the fitting schedule. That helps the work move in the right order, from preparation and first fix through to final fitting and finishing, instead of leaving you to chase separate appointments while the room is out of action.
Can you still help if we already have a kitchen bought?
Yes. If your kitchen is already sourced, we can still discuss the fit only route through One Kitchens and Bedrooms. The planning stage remains important, because even when products are already chosen, the layout, services and fitting sequence still need to be checked carefully before work begins.
