Why this route feels more organised
Supply only stays open
You can buy the kitchen through us even if your fitting plans are already sorted.
Trades are coordinated
Plumbing, electrics and plastering are timed around the fit to cut downtime.
Choices are settled early
Showroom visits help you decide finishes before orders are placed and dates are booked.
A full kitchen project with fewer loose ends
A new fitted kitchen works best when the planning is sorted before the first unit arrives. At One Kitchens and Bedrooms, we start with your layout, storage needs, appliance list and budget, then turn that into a design you can picture clearly. From Loftus, we handle the supply and fit route through One Kitchens and Bedrooms, giving you one joined up plan from room measure to final trim. If you only need the products, you can choose supply only. If you want the whole job managed, we schedule the fitting work and line up trusted trades when plastering, plumbing or electrics need to happen at the right stage.


Good planning keeps installation day calm
Before anything is ordered, we produce the plans in house and help you pin down the details that usually slow a job down later. That includes room constraints, worktop runs, appliance positions and the finish you want the room to land with. Through One Kitchens and Bedrooms, you also get access to a supplier showroom where you can compare ranges, colours and components properly. Most kitchen installation phases take around two weeks once we are on site, and many projects aim to start within roughly six weeks of your first enquiry, depending on capacity and the trade schedule.
Frequently asked questions
Can we choose supply only and arrange fitting later?
Yes. If you do not need installation straight away, we can guide you through the supply route and make sure the design, measurements and ordering details are clear. When fitting is needed, we can then discuss how the installation stage would be scheduled through One Kitchens and Bedrooms.
How long does a new kitchen install usually take on site?
For many full kitchen projects, the main on site installation phase is around two weeks. The exact length depends on the layout, the finishing choices, and when plumbing, electrics or plastering need to slot into the schedule around the fitting work.
What should we decide before the kitchen is ordered?
It helps to settle your appliance list, sink and tap choice, layout priorities, worktop style and any room constraints early. Those decisions let us sign off the design properly, place accurate orders, and cut down on late changes once materials are arriving.
